Recent Projects
Massachusetts Maritime Academy Phase 1 – Life Safety Upgrades Value: $3.5 Million Member of pre-construction team (MSCBA, Prellwitz Chillinski and Erland). Scope of work included cost estimating, cost control, value engineering, subcontractor solicitation and scope verification. Cost estimating efforts provided at schematic design, design development and final bidding for GMP. Owner: MSCBA Architect: Steve Allen PCA
Massachusetts Maritime Academy Phase 2 – Cadet Housing additions and renovations Value: $13 Million Member of pre-construction team (MSCBA, Prellwitz Chillinski and Erland). Scope of work included cost estimating, design option considerations for expansion, cost control, value engineering, subcontractor solicitation and scope verification. Cost estimating efforts provided at schematic design, design development and final bidding for GMP. Owner: MSCBA Architect: Steve Allen PCA
Volpe National Transportation Ceneter – Multiple Projects Value: $20 Million Multiple projects consisting of Master plan studies, ADA upgrades, facade and site improvements, Cafeteria/Library renovations, life safety upgrades, mechanical and utility replacements for over 200,000 square feet in six buildings. Member of pre-construction team (Guzman Architects). Scope of work included cost estimating, cost control, value engineering, Cost estimating efforts provided at schematic design, design development and final bidding for comparison to CM. Client: Marc Prufer, Guzman Architects
13 Boston Schools – Life Safety Upgrades Value: $13 Million Project consisted of life safety upgrades to 13 city of Boston elementary and middle schools. Member of pre-construction team (City of Boston and Maricor Group). Scope of work included cost estimating, cost control, value engineering, Cost estimating efforts provided at schematic design, design development and final bidding for comparison to CM.
Mass Art – New Dormitory Value: $23 Million Project consisted of a new 125,000 square-foot student housing complex including underground parking on Huntington Avenue. Scope of work included cost estimating, cost control, value engineering, Cost estimating efforts provided at schematic design, design development and final bidding for comparison to CM.
Harvard Graduate Student Housing Value: $80 Million Project consisted of a new 225,000 square-foot graduate student housing complex including underground parking along the Charles River in Alston. Member of pre-construction team (Harvard, Machado & Silvetti and Bond Bros). Scope of work included cost estimating, cost control, value engineering, Cost estimating efforts provided at schematic design, design development and final bidding for comparison to CM.
Univerity of Michigan – Mason and Haven Halls Value: $25 Million Project consisted of a 213,000 square-foot renovation and addition of a student center building. Scope of work included cost estimating, cost control, value engineering, Cost estimating efforts provided at schematic design, design development and final bidding for comparison to CM.
Harvard School of Dental Medicine Research and Educational Building Boston, MA Value: $23 Million Cost consulting services for the the costruction of a 68,000 square-foot Research lab and educational center including administrative office.
University of New Hampshire Durham, NH Value: $50 Million Cost consulting services for the renovations and additions to Kingsbury Hall College of Engineering and Science totaling 188,000 square-feet.
Northfield Mount Herman School - Cottage Housing Northfield, MA Value: $6.8 Million Estimated schematic to GMP for two 15,000 square-foot new dormitory wood framed housing buildings.Completed subcontractor solicitation through buy-out.
Yale University School of Nursing New Haven, CT Client: CDS, LLC (Owner/developer) Value: $40 Million Hired as a consultant to provide pre-construction, bidding and construction phase consulting services for the construction of a 300,000 sqauare-foot parking garage and 105,000 square-foot medical offfice building.
Harvard Business School Hawes Hall Alston, MA Value: $13 Million Cost consulting services for 60,000 SF classroom/lecture building
Charles River School Dover, MA Value: $5.5 Million Cost consulting services for new and renovated classroom buildings and sitework
Horace Mann School Tillinghast Hall Renovation and Addition Riverdale, NY Value: $28 Million Cost consulting services for theater, library and classroom renovations
Boston University Boston MA Value: $21 Million Cost consulting services for Biology & Physics Research Building
Phillips Academy Richard L. Gelb Science Center Andover, MA Value: $16 Million Cost consulting services for 55,000 SF science building Highland Animal Hospital Needham, MA Client: Highland Animal Hospital (Owner) Value: $2.5 Million Hired as part of the pre-construction team and worked with Highland Animal Hospital owners, Architect and the selected general contractor in a design-build negotiated project approach. This project included construction of a ground-up 10,000 square-foot clinic / hospital building on a complex site. Boston Pulic Health Commission Boston, MA Client: Boston Public Health Commission (Owner) Value: $200 K Hired as a consultant and provided pre-construction, bidding and construction phase consulting services for the renovation of a 10,000 square-foot office space. In this process, we provided on-site supervision and project management. The owner tendered all subcontracts. CNE Data Center Kent Hospital Warwick, RI Value: $6 Million Cost consulting services for the the costruction of a 37,000 square-foot Data center and office building
|